- Projects owned
- None
- Equipment sold
- None
- Fee that depends on the answer
- None
Adviser for wind and solar projects
Independent
We own no projects, sell no equipment and take no fee that depends on the answer.
Skerrow is an independent technical adviser for wind and solar projects. Our energy yield assessments let a developer decide whether to build, and a bank decide how much to lend.

Carrick Law Wind Farm
Energy Yield Assessment. Scottish Borders, 58.8 MW
Gross yield
236.4
GWh a year
Losses
15.4%
Net yield, P50
200.0
GWh a year
Capacity factor
38.8%
Share of the year’s production by month
Net yield over ten years
GWh a year
Ten-year uncertainty 9.2%
Developers, lenders, infrastructure funds, utilities and community energy groups rely on our reports.
What clients sayMost of our projects are in the United Kingdom, Ireland, Germany, the Nordic countries, Spain and Poland.

Net yield
Hollin Bank Solar Farm
For projects with or without storage
The long-term net production of a wind or solar project before it is built.

In the field
41 masts and 23 lidar units, November 2026
Solar measurement stations
Data checked every working day
A fault reported within 24 hours
Design, installation and daily monitoring of the instruments on a site.

Review
Re-run from the raw data
An independent review of an assessment somebody else wrote.

Production data
At least 12 months of the farm’s own data
Used for refinancing, for a sale, and to find production that is being lost.
A new estimate for a farm that is already running.

First P50, with its range
Delivered in 5 working days
A note on what to measure
A first estimate for a site with no measurements yet.

One grid connection
What the site would produce
What a site would produce with new turbines, or with solar or storage added.
Five kinds of client, and what each asks us for.

Developers
Which sites to measure, and a report a lender will accept.

Lenders
An independent check before financial close, and answers for the credit committee.

Infrastructure funds
What a portfolio is really worth before a purchase.

Utilities
Repowering old farms, and adding solar or storage to a grid connection.

Community energy groups
A bankable report at a fee a small project can carry.
Adviser for wind and solar projects
We own no projects, sell no equipment and take no fee that depends on the answer.
Final report
With a reliance letter for the lender
Author
Checker
Every report is signed by the two engineers who wrote and checked it.
Produced, on average, across 212 operating farms
99.6%
of our P50 estimate
Within 6% of their estimate88%
Every year we publish how our past estimates compared with what the farms actually produced.
The 2026 validation studyOur main product is a report, the energy yield assessment: how much electricity a wind farm or a solar farm will produce over its life, and how sure that figure is.
Scottish Borders. 14 turbines of 4.2 MW, 58.8 MW in all, at a hub height of 105 m. Measured for 24 months with an 80 m mast and a lidar unit. The six losses, taken together, remove 15.4% of the gross yield.
See what an assessment costs
From gross yield to net
Carrick Law Wind Farm, GWh a year
Long-term mean wind speed at hub height
8.1 m/s
Lincolnshire. 62.4 MWp of panels on single-axis trackers, 49.9 MW at the grid connection. Sunshine on a flat surface: 1,084 kWh for each square metre a year.
Request an assessment
Hollin Bank Solar Farm
Energy Yield Assessment. Lincolnshire, 62.4 MWp
Specific yield
1,012
kWh for each kWp a year
Net yield, P50
63.1
GWh a year
Ten-year P90
58.6
GWh
Ten-year uncertainty
5.6%
Performance ratio83.4%

Measurements from masts and lidar units on the site. The model covers:
Measurements from floating lidar and from satellites. The model covers:
Sunshine measured from satellites and on the ground. The model covers:
Six steps, from a free scoping call to a report signed by both engineers. The draft comes four weeks after the data is complete.
Site visit
Cleaned and corrected
Modelled across the site
Thirty minutes with an engineer, free, to agree what the report is for and who will rely on it.
Within one working day you get a short list of the data needed and a secure data room to put it in.
An engineer visits the site and every instrument on it. For a solar farm of 50 MW or less the visit may be replaced by the installer’s photographs.
The measurements are cleaned, corrected to the long term and modelled across the site. Two engineers work on every report: one writes, one checks.
Four weeks after the data is complete, with a call to go through it.
Signed by both engineers, with a reliance letter for the lender. Questions from the lender’s own adviser are answered for 12 months at no charge.
Thirty minutes with an engineer, free, to agree what the report is for and who will rely on it.
Within one working day you get a short list of the data needed and a secure data room to put it in.
Site visit
Cleaned and corrected
Modelled across the site
An engineer visits the site and every instrument on it. For a solar farm of 50 MW or less the visit may be replaced by the installer’s photographs.
The measurements are cleaned, corrected to the long term and modelled across the site. Two engineers work on every report: one writes, one checks.
Four weeks after the data is complete, with a call to go through it.
Signed by both engineers, with a reliance letter for the lender. Questions from the lender’s own adviser are answered for 12 months at no charge.
Stage 1 of 3: 1. Scoping call, 2. Data request
All fees are in pounds sterling and exclude VAT.

A first estimate for a site with no measurements yet.
£3,900a site
Fixed. Delivered in five working days.
One fixed fee, agreed before work starts.
From£14,500
For a solar farm of up to 50 MW. From £24,000 for an onshore wind farm of up to 100 MW.
For a bank or a fund ahead of financial close.
From£9,800
An independent review of an assessment somebody else wrote.
Founded in 2012 in Edinburgh by an atmospheric physicist and a wind engineer, after both had spent years at a turbine maker checking other firms’ estimates against what the farms later produced.

The firm in figures
Projects assessed since 2012, to October 2026
1,460
Wind and solar capacity assessed, in 31 countries
38 GW
Project debt raised on reports we wrote or reviewed
£9.4 billion
Lenders have accepted our reports
64
Reports in 2025 issued on or before the agreed date
97%
46 staff
November 2026
Published every year. The 2026 study, issued in September 2026, covers 212 operating farms that we assessed before they were built, each with at least three years of production data: 148 wind farms and 64 solar farms, in 19 countries. It names every farm that fell short by more than 10%, and says why.
What clients say
2026 validation study
212 operating farms in 19 countries
Produced, on average
99.6%
of our P50 estimate
Farms within 6% of their estimate88%
ISO 9001:2015
Certified since 2015
Certified to ISO 9001:2015, and has been since 2015.
ISO/IEC 17025
Accredited since 2018
Accredited to ISO/IEC 17025, and has been since 2018.
ISO/IEC 27001
Certified since 2021
Client data is held in the United Kingdom and the European Union.
“Skerrow’s P90 was lower than the figure we had been carrying. They were right, and the bank knew they would be.”

Marta Lindqvist
Head of development
Solveig Kraft
“We send them the assessments we are asked to lend against. They re-run the numbers from the raw data, and the report says plainly where they disagree.”

Owen Barraclough
Director of project finance
Castellan Project Finance
“Three years on, the farm is within one percent of their estimate. That is the only review of a consultant that matters.”

Farah Siddiqui
Asset manager
Northmoor Renewables
46 staff in November 2026: 29 analysts and engineers, 6 measurement technicians, 5 in software and data, and 6 in the office.

Managing director and co-founder
Atmospheric physicist. Wrote the firm’s long-term correction method, which is published in full.

Technical director and co-founder
Wind engineer. Has checked more than 600 of the firm’s reports.

Head of offshore wind
Joined in 2016 from a research institute for offshore meteorology.

Head of solar
Built the solar practice from 2017, now a third of the firm’s work.

Head of measurement
Runs the campaigns: 41 masts and 23 lidar units in the field in November 2026.

Head of the Hamburg office
Opened the office in 2020.
A request is answered within one working day, by an engineer. We are booking assessments that start in January 2027.

